LIRR Far Rockaway Branch Changes

Posted on

Starting Friday April 16th at 10:15 pm and continuing until Monday April 19th at 3:30 am, both the Long Beach branch and the Far Rockaway branch will be taken out of service to allow for a signal cutover in Valley Stream to occur which is part of our Hurricane Sandy restoration efforts.

While this work is being performed, train service along the Long Beach and Far Rockaway branches will be suspended in both directions.

Along the Long Beach branch:

Along the Far Rockaway branch:

We encourage you to check Long Island Rail Road schedules here for a list of the full impacts and changes.

*Work is weather dependent, dates are subject to change to take advantage of favorable conditions