Building Permit
New 1 and 2 Families

1st & 2nd floor $3 per sq. ft.
Finished cellar/basement $2 per sq. ft.
Unfinished cellar/basement $1 per sq. ft.

1 and 2 Families

$250 for the first $1,000 cost of construction
$17 for each additional $1,000 in cost of construction

Other

$300 for the 1st  $1,000 cost of construction
$17 per additional $1,000 cost of construction

Certificate of Occupancy / Certificate of Comp

1 and 2 Family $200
Other $325
C/O & C/C Letter $100

Plumbing Permit
1 and 2 Family

$70 plus $40 per fixture

Other

$125 plus $70 per fixture

Boiler

$200

Hot Water Heater

$125

Pressure Test

$200

Water Main

$175

Oil Tank Abandonment

$75* in addition Nassau County Paperwork required

Sewer Hook-up

*Nassau County

Residential 13D Fire Sprinkler System

$150 per floor

Electrical
1 and 2 Family

$75 plus $1 for all points over 25

Other

$75 plus $2 for each point

Generator
Permit

$100

Pressure Test (Plumbing)

$200

Electrical

$75

Other
Fence

$45

Sidewalk

$30 plus .50 per lineal ft. (Commercial)
$25 flat fee for repair (Residential)

Street Opening

$500

Tent

$100 * in addition  Nassau County Fire Marshal paperwork Required

Pool

$1000 over 10,000 gallons
$500 under 10,000 gallons

Curb Cut

$100 (1 and 2 family)
$75 plus $15 per lineal foot (other)

Awning & Canopies

$225

Signs

$225 plus $5 per sq. ft in excess of 50 sq. ft.

Demolition

$1000

Dumpster
1 and 2 Family

$50 for 1st day plus $10 each add. day

Other

$100 for 1st day plus $50 each add. day

Pods/Storage Container

$50 (First 30 days) $50 each additional 30 day extension (maximum 2-30 day extension)

Variance Fees
1 and 2 Family

$1000 first section of code
$750 each additional section of code
Applicant to pay additional fees for example stenographer, legal notice in paper

Plan Review

$200

Other

$1500 first section of code
$1000 each additional section of code
Plus $1000 up front (fees in advance) if fees are above $1000 applicant shall be responsible for fees

Air Conditioning
1 and 2 Family

$100 plus $10 per ton
$100 Replacement

Multiple Dwelling

$500 plus $10 per ton
$100 Replacement

Commercial

$500 plus $10 per ton
$100 Replacement

Parking
Parking Meter Rent for Construction

$10 per day/per meter

Village Park

Application Fee $100
Per Day-Park Use Fee $500