Click on a fee title to display all fee information.
1st & 2nd floor $3 per sq. ft.
Finished cellar/basement $2 per sq. ft.
Unfinished cellar/basement $1 per sq. ft.
$250 for the first $1,000 cost of construction
$17 for each additional $1,000 in cost of construction
$300 for the 1st $1,000 cost of construction
$17 per additional $1,000 cost of construction
1 and 2 Family $200
Other $325
C/O & C/C Letter $100
$70 plus $40 per fixture
$125 plus $70 per fixture
$200
$125
$200
$175
$75* in addition Nassau County Paperwork required
*Nassau County
$150 per floor
$75 plus $1 for all points over 25
$75 plus $2 for each point
$100
$200
$75
$45
$30 plus .50 per lineal ft. (Commercial)
$25 flat fee for repair (Residential)
$500
$100 * in addition Nassau County Fire Marshal paperwork Required
$1000 over 10,000 gallons
$500 under 10,000 gallons
$100 (1 and 2 family)
$75 plus $15 per lineal foot (other)
$225
$225 plus $5 per sq. ft in excess of 50 sq. ft.
$1000
$50 for 1st day plus $10 each add. day
$100 for 1st day plus $50 each add. day
$50 (First 30 days) $50 each additional 30 day extension (maximum 2-30 day extension)
$1000 first section of code
$750 each additional section of code
Applicant to pay additional fees for example stenographer, legal notice in paper
$200
$1500 first section of code
$1000 each additional section of code
Plus $1000 up front (fees in advance) if fees are above $1000 applicant shall be responsible for fees
$100 plus $10 per ton
$100 Replacement
$500 plus $10 per ton
$100 Replacement
$500 plus $10 per ton
$100 Replacement
$10 per day/per meter
Application Fee $100
Per Day-Park Use Fee $500